Select region and country
Diesel < 2617 kVA
Gas < 1183 kVA
Diesel < 420 kVA
Diesel
Gas
Diesel < 42 kVA
Diesel < 2536 kVA
My products
Downloads
All
NEWS
CASE STUDIES
PRODUCT LAUNCH
WHITE PAPER
We have detected that you are using Internet Explorer
For a better user experience on our website, we recommend that you access with another browser, such as
| Chrome | Firefox | Edge | Safari |
If you decide to continue browsing with Explorer, we inform you that many functionalities, menus, banners..., will not run correctly.
Hemos detectado que estás usando Internet Explorer
Para una mejor experiencia de uso en nuestra web, te recomentados que accedas con otro navegador, como por ejemplo
Si decides seguir navegando con Explorer, te advertimos que muchas utilidades, menús, etc de este website no funcionarán bien con él.
Location: Doha (Qatar)
Installed power: 5X1736 kVA = 8,7MVA stand-by power
Generator sets: 5 HTW-1745 T5 units 5.238x2.043x2.600 mm (L x W x H)
Special configuration: Redundant emergency power supply with a 7-second start-up synchronised to a Dead Bus. Assumes 100% of the load in one single step. Redundant control panels.
Distributor: FAMCO
Occupying 670,000 square metres in the very heart of the Middle East, Doha Festival City will be home to more than 500 stores, including over 100 restaurants, and a world-class entertainment complex, with both indoor and outdoor attractions unique to Qatar. This comprehensive mix of entertainment– from Qatar’s first VOX 4D cinema complex with 18 digital screens, to four unique theme parks, including “Angry Birds World”, “Snow Dunes” - Qatar’s first indoor snow park, “Juniverse” – an edutainment park for children and “Virtuocity” which has been created exclusively for teens and adults.
With footfall expected to exceed 1.6 million people per month, safety and the proper operation all business units at Doha Festival City will heavily rely on a system capable of supplying power in the event of an emergency. Not only that, such a system must meet the requirements that the Qatar Civil Defence has envisaged for public spaces.
To feed such a huge complex and to respond quickly in the event of a power cut, HIMOINSA has supplied five generator sets, which each supply 1.736 kVA of stand-by energy. Thanks to a detailed programming study of its control units, and after having subjected the units to multiple highly demanding tests, HIMOINSA is able to guarantee a synchronised start-up in just seven seconds, which in fact exceeds the project's technical specifications.
OBJECTIVE
To guarantee an uninterrupted supply of electricity with generator sets capable of starting up in synchronicity with 100% of the load and in less than 10 seconds in the event of a failure in the supply of electric power.
SOLUTION
Five HTW-1745 T5 generator sets that supply a total of 8.7MVA of stand-by power and respond seven seconds after any power failure. The units feature Mitsubishi engines and Stamford alternators that have been oversized and fitted with sophisticated control systems that synchronise the gensets. The gensets are also prepared to work in a maximum ambient temperature of 55 degrees centigrade.
“The biggest challenge of this project”, states Terry McGuire, FAMCO Regional General Manager, “was to meet the stringent requirements of Qatar Civil Defence. We needed to prove that all the gensets would be able to run from a dead start, synchronise and produce power within ten seconds. We managed to show this by the factory witness test, where we achieved 7.8 seconds and we also proved the same results on site.”
The PI734E alternator has been oversized to 1900kVA and fitted with a programmable Digital Voltage Governor capable of providing an extremely quick response. Also, at the mechanical level, we guaranteed the temperature controls in the bearings and the winding so that they can operate safely and continuously, even for longer periods of time, were that to prove necessary.
All the engine's vital parameters such as the oil pressure, the temperature of the water or the oil or the exhaust fumes are measured continuously and they communicate with a monitoring system that controls the condition of the engine.
To ensure a fast response in the event of a grid failure, a water pre-heating system was added, as was a battery charger that ensures maximum efficiency.
HIMOINSA has used Deep Sea control units that allow the units to sync directly with a Dead Bus, thereby saving time manoeuvring the motorised circuit breakers in each generator set. The control systems are also connected to a PLC that handles the running of the generator sets and their interactions with the shopping complex's distribution system.
Terry McGuire, Regional General Manager, FAMCO
"To consider a complex project like this, we needed the full support of the HIMOINSA Engineering team, as the requirements are enormous and highly technical".
Tony Gumley, Senior MEP Manager- ALEC
"What we look for is a large international supplier who can deliver when we need it and also work with us with all the complex issues that arise during the development".
Kareem M. Shamma, Chief Executive Office – Bawabat Al-Shamal Real Estate Company W.L.L
"When selecting partners and suppliers for the project, we looked for reliability, the ability to deliver on their promises and an excellent customer service. When you have a large project like this that runs on a tight schedule, power supply is extremely important and the ability to meet the requirements of the projects at all times to ensure no power supply cut offs is essential".
A cookie or computer cookie is a small information file that is saved on your computer, smartphone or tablet each time you visit our website. Some cookies are ours and others belong to external companies that provide services for our website. Cookies can be of various types: technical cookies are necessary for our website to function, they do not need your authorization and they are the only ones that we have activated by default. The rest of cookies are used to improve our page, to personalize it based on your preferences, or to be able to show you advertising tailored to your searches, tastes and personal interests. You can accept all these cookies by pressing the ALLOW ALL button, accept or reject their use by clicking on each of them and then on the ALLOW SELECTED button. Cookies policy
Necessary Statistics Marketing Show details
Necessary
Technical cookies are strictly necessary for our website to function and to be able to navigate through it. These types of cookies are those that, for example, allow us to identify you, give you access to certain restricted parts of the page if necessary, or remember different options or services already selected by you, such as your privacy preferences. Therefore, they are activated by default, your authorization is not required in this regard.
Statistics
The analysis cookies allow us to study the navigation of the users of our website in general (for example, which sections of the page are the most visited, which services are used the most and if they work correctly, etc.). Based on the statistical information on navigation on our website, we can improve both the operation of the page itself and the different services it offers. Therefore, these cookies do not have an advertising purpose, but only serve to make our website work better, adapting to our users in general. By activating them you will contribute to this continuous improvement.
Marketing
Marketing cookies are used to track visitors on web pages. The intention is to show ads relevant and attractive to the individual user, and therefore more valuable to publishers and third-party advertisers.